Kario Track Working Bee a Great Success!

John's picture
in

I'd like to thank all the AHGPC members who came along this morning to Kario and helped out in the working bee. The combination of 6-wheel truck and Mustang skid-steer loader was extremely effective. Instead of placing one 10-ton load of 65 Slag, we ended up ordering in three truck loads of the stuff. We have now filled in the worst of the pot-holes on the track, so 4WD vehicles will find it easier to get up to the launch site over the coming flying season.

Thanks, guys!

 

John Burton

Secretary

Comments

Also bring

Leslie's picture

Also bring spades and grubbers/mattocks to re-form the runoff drains as water is the biggest contributor to track deterioration. It would be good to see a better turnout of hang glider pilots who regularly use this site. The turnout to our last working bee here was dismal.

Cheers

Les

Working Bee

Worker bees: Watching the contractor doing 99% of the work.Worker bees: Watching the contractor doing 99% of the work.

Contribution from Franklin

Leslie's picture

We have received a generous contribution of $500 from Franklin D.C. towards the cost of this maintenance.

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.